Measurement
Science & Engineering
Digital & Data
Everyday
Popular converters All converters Blog About

Construction Calculators

Concrete, gravel & mulch volumes, cubic yards, tons & board feet

Estimate how much concrete, gravel, mulch or lumber a project needs, then convert between cubic feet, cubic yards, cubic meters and board feet. Every tool shows the formula, so you can check the numbers before you place an order.

3 tools4 unitsUpdated

Convert volume units

Live
  • Cubic feet27 ft³
  • Cubic yards1 yd³
  • Cubic meters0.76455486 m³
  • Board feet324 bd ft
Complete list

All construction tools

Every construction calculator and volume converter on Panglify, grouped by task. Each page includes the formula, a worked example and practical ordering notes.

3 tools
No tool matches that. Try concrete, gravel, yards or tons.

7 more construction tools are on the way.

How do you calculate cubic yards for a project?

To get cubic yards, measure length × width × depth in feet, then divide by 27. Almost every material estimate on a job site follows this pattern. Concrete, gravel, sand, topsoil and mulch are all sold by the cubic yard in the US, and one cubic yard is a cube 3 ft on each side, so it holds 3 × 3 × 3 = 27 cubic feet.

The volume formula

  1. Convert every dimension to feet. Depth is usually given in inches, so divide it by 12.
  2. Multiply length × width × depth to get cubic feet.
  3. Divide cubic feet by 27 to get cubic yards, or multiply by 0.0283 to get cubic meters.

Worked example: a 12 × 16 ft patio slab, 4 in thick. Depth is 4 ÷ 12 = 0.3333 ft, so the volume is 12 × 16 × 0.3333 = 64 ft³. Then 64 ÷ 27 = 2.37 yd³. Adding 10% for waste and uneven subgrade brings the order to about 2.61 yd³. The concrete volume calculator runs these steps for slabs, footings and columns, and the cubic feet to cubic yards converter handles the last step on its own.

Quick rule: 1 yd³ = 27 ft³ ≈ 0.7646 m³. One cubic yard covers 81 ft² at 4 in deep, 108 ft² at 3 in and 162 ft² at 2 in.

Board feet for lumber

Hardwood and some framing lumber is priced by the board foot, a volume of 144 cubic inches (1 ft × 1 ft × 1 in). Multiply thickness in inches × width in inches × length in feet, then divide by 12. A 2 × 6 that is 10 ft long is 2 × 6 × 10 ÷ 12 = 10 board feet. Board feet are normally figured from nominal dimensions, not the smaller actual size of dressed lumber.

Cubic feet to cubic yards chart

Common cubic foot volumes converted to cubic yards, rounded to three decimal places. For any other volume, use the cubic feet to cubic yards converter.

Cubic feet to cubic yards chart
Cubic feet (ft³)Cubic yards (yd³)
1 ft³0.037 yd³
5 ft³0.185 yd³
10 ft³0.37 yd³
13.5 ft³0.5 yd³
20 ft³0.741 yd³
27 ft³1 yd³
40 ft³1.481 yd³
50 ft³1.852 yd³
54 ft³2 yd³
75 ft³2.778 yd³
81 ft³3 yd³
100 ft³3.704 yd³
135 ft³5 yd³
200 ft³7.407 yd³
270 ft³10 yd³

Concrete needed for common slab sizes

Exact volumes for rectangular slabs, the same volume with 10% added for waste, and the number of premixed bags for the exact volume. Bag counts assume typical yields of 0.60 ft³ per 80 lb bag and 0.45 ft³ per 60 lb bag; check the yield printed on your product.

Concrete needed for common slab sizes
SlabCubic feetCubic yardsPlus 10%80 lb bags60 lb bags
4 × 4 ft, 4 in thick5.33 ft³0.20 yd³0.22 yd³912
10 × 10 ft, 4 in thick33.33 ft³1.23 yd³1.36 yd³5675
10 × 12 ft, 4 in thick40.00 ft³1.48 yd³1.63 yd³6789
12 × 12 ft, 4 in thick48.00 ft³1.78 yd³1.96 yd³80107
10 × 20 ft, 4 in thick66.67 ft³2.47 yd³2.72 yd³112149
12 × 20 ft, 4 in thick80.00 ft³2.96 yd³3.26 yd³134178
20 × 20 ft, 4 in thick133.33 ft³4.94 yd³5.43 yd³223297
24 × 24 ft, 4 in thick192.00 ft³7.11 yd³7.82 yd³320427
10 × 10 ft, 6 in thick50.00 ft³1.85 yd³2.04 yd³84112
20 × 20 ft, 6 in thick200.00 ft³7.41 yd³8.15 yd³334445

What does a “yard” of concrete or gravel mean?

A “yard” of concrete, gravel, soil or mulch always means a cubic yard: 27 cubic feet, a cube 3 ft on each side. It is a volume, not the square yard (9 ft²) used for carpet and turf, and not the linear yard used for fabric or rope.

To link the two, you need a depth. One cubic yard spread 4 in deep covers 81 ft², which is 9 square yards; spread 2 in deep it covers twice as much. Linear feet work the same way one dimension down: decking, trim and lumber are sold by length, and multiplying the length by the board width in feet gives the area covered. The area converter handles square feet, square yards and square meters once you have that area.

Bags or ready-mix?

Bagged concrete makes sense for small jobs such as fence posts, steps and small pads. Beyond about a cubic yard it becomes heavy work: one cubic yard takes about 45 bags of 80 lb at a typical yield of 0.60 ft³ per bag, or roughly 3,600 lb of dry mix to lift and mix, so a ready-mix truck is usually the practical choice for driveways, larger slabs and footings. Use the concrete calculator to size the pour before you decide.

How much does a cubic yard of gravel, sand or soil weigh?

A cubic yard of gravel typically weighs about 1.4–1.7 US tons, dry sand about 1.2–1.5 tons and topsoil about 1.0–1.3 tons, depending on the material, its grading and how wet it is. For pounds, kilograms and metric tonnes, the weight converter takes over from there.

Suppliers quote bulk materials by the cubic yard but trucks, scales and some quarries work in tons. The conversion depends entirely on the material's density and moisture, so the figures below are typical ranges for dry material, not exact values. Wet sand, clay or saturated gravel can weigh noticeably more. Confirm with your supplier, or use the cubic yards to tons calculator as a starting estimate.

  • Gravel and crushed stone: about 1.4–1.7 US tons per cubic yard.
  • Sand: about 1.2–1.5 tons per cubic yard when dry.
  • Topsoil: about 1.0–1.3 tons per cubic yard, depending on moisture and organic content.
  • Normal-weight concrete: about 2 tons per cubic yard, from a density of roughly 145–150 lb per cubic foot.
  • Bark mulch and wood chips: roughly 0.2–0.4 tons (400–800 lb) per cubic yard.

Other everyday job-site conversions

  • Roofing: shingles are sold by the square, which is 100 ft² of roof surface. Divide the measured roof area in square feet by 100 to get the number of squares.
  • Decking, trim and flooring strips: linear feet times board width gives the covered area in square feet.
  • Metric plans: ready-mix ordered in cubic meters converts at 1 m³ ≈ 1.308 yd³.

How do cubic yards, cubic feet and cubic meters relate?

One cubic yard is exactly 27 cubic feet, or about 0.7646 cubic meters, and one cubic meter is about 1.308 cubic yards. Every value in the table below follows from the international yard of exactly 0.9144 m, fixed by the 1959 International Yard and Pound Agreement, and the US gallon of exactly 231 in³ in NIST Handbook 44.

UnitEqualsExact size in cubic meters
1 cubic yard (yd³)27 ft³ = 46,656 in³ = 324 board feet0.764554857984 m³
1 cubic foot (ft³)1,728 in³ ≈ 7.48052 US gallons = 12 board feet0.028316846592 m³ (≈ 28.3168 L)
1 board foot (bd ft)144 in³ = 1/12 ft³0.002359737216 m³
1 cubic meter (m³)≈ 1.30795 yd³ ≈ 35.3147 ft³ ≈ 423.776 board feet1 m³ (1,000 L)

These factors matter when plans, suppliers and products use different systems: a structural drawing may specify concrete in cubic meters, the ready-mix plant may batch in cubic yards, and a sealer or curing compound may be sold by the gallon. Convert small volumes with the cubic feet to cubic yards converter, and liquids with the volume converter.

How much extra material should you order?

Order about 5–10% more concrete and 10–15% more gravel or base stone than the calculated volume, and expect mulch and topsoil to settle after they are spread.

An exact volume is the minimum you need, not what you should order. Real jobs lose material to over-excavation, uneven ground, form bulge, spillage and compaction, so estimators add an allowance on top of the calculated volume.

  • Concrete: add 5–10%. Running short in the middle of a pour creates a cold joint, which costs far more than a little extra concrete.
  • Gravel and base stone: loose aggregate compacts when it is tamped or rolled, so order roughly 10–15% more than the finished depth requires. The same length × width × depth ÷ 27 formula gives the gravel volume for driveways and paths.
  • Mulch and topsoil: these settle over the first weeks, so a 3 in layer may end up closer to 2 in. Bagged mulch is often sold in 2 ft³ bags, so one cubic yard equals 13.5 bags.
  • Round up to the delivery unit. Ready-mix plants often sell in quarter or half yard increments and may charge a short-load fee for small orders.

Always check your local building code and the product manufacturer's instructions for required slab thickness, reinforcement and base preparation. These calculators estimate quantities; they do not replace an engineer's design.

Sources and further reading

The standards and references behind the numbers on this page. Links open in a new tab.

Reference

Construction volume units and their exact values

Each unit below is defined exactly in cubic meters through the international inch, foot and yard, so volume conversions are exact.

1 cubic foot (ft³ · Imperial / US)
1,728 in³
1 cubic yard (yd³ · Imperial / US)
27 ft³
1 cubic meter (m³ · Metric (SI))
1,000 L
1 board foot (bd ft · US lumber)
144 in³ (1 ft × 1 ft × 1 in)

Sources: International Yard and Pound Agreement (1959; 1 yd = 0.9144 m exactly), NIST Handbook 44. The board foot of 144 in³ is the standard US lumber measure.

Questions

Construction calculator FAQs

Quick, exact answers to the questions people ask most.

How many cubic feet are in a cubic yard?

There are exactly 27 cubic feet in one cubic yard, because a cubic yard measures 3 ft × 3 ft × 3 ft. Divide cubic feet by 27 to get cubic yards.

How many yards of concrete do I need for a 10x10 slab?

A 10 × 10 ft slab 4 in thick needs 10 × 10 × 0.3333 = 33.33 ft³, which is about 1.23 yd³. With 10% extra for waste, order about 1.36 yd³.

How many 80 lb bags of concrete make a yard?

An 80 lb bag typically yields about 0.60 ft³, so one cubic yard takes 27 ÷ 0.6 = 45 bags. With 60 lb bags yielding about 0.45 ft³, you need 60 bags per yard.

How many tons are in a yard of gravel?

A cubic yard of gravel typically weighs about 1.4 to 1.7 US tons, depending on stone size and moisture. Ask your supplier for the exact figure for their product.

How much area does a cubic yard cover?

One cubic yard covers 81 ft² at 4 in deep, 108 ft² at 3 in and 162 ft² at 2 in. Divide 324 by the depth in inches to get the coverage in square feet.

How many cubic yards are in a cubic meter?

One cubic meter equals about 1.308 cubic yards, and one cubic yard equals about 0.7646 cubic meters.

How much does a yard of concrete weigh?

A cubic yard of normal-weight concrete weighs about 3,915–4,050 lb, roughly 2 US tons. That comes from a typical density of 145–150 lb per cubic foot multiplied by 27 ft³.

How many cubic feet are in a cubic meter?

One cubic meter is about 35.3147 cubic feet. One cubic foot is exactly 0.028316846592 m³, or about 28.3168 liters.

How do you calculate board feet?

Multiply thickness in inches × width in inches × length in feet, then divide by 12. A 2 × 8 board 12 ft long is 2 × 8 × 12 ÷ 12 = 16 board feet.

How thick should a concrete slab be?

Patios, walkways and shed floors are commonly poured 4 in thick, while driveways that carry vehicles are often 5–6 in thick. Your local building code and soil conditions set the actual requirement, so check them before you pour.

How many bags of mulch are in a cubic yard?

With the common 2 ft³ bag, one cubic yard equals 27 ÷ 2 = 13.5 bags. With 3 ft³ bags it takes 9 bags.